INDIA SUDAR EDUCATIONAL AND CHARITABLE TRUST Registered No: 454/2004
web: www.indiasudar.org email: admin@indiasudar.org Flat No. D, No. 2/43 2nd
Street Vedha Nagar, Chinmaya
Nagar Stage II Ext, Chennai - 600 092 |
||||||||||||||||||
PROJECT REPORT |
||||||||||||||||||
Project Code |
9 |
Project Name |
INFRASTRUCTURE |
Category |
BUILDING RENOVATION |
|||||||||||||
Work Code |
9.170 |
Financial Year |
2022 - 2023 |
State |
TN |
|||||||||||||
Work Description |
India Sudar renovated the Girls toilet
(13 x 21 Feet) and fixed pavers block (1235 sq
Feet) in front of the girls toilets at GHSS Velliangadu. |
|||||||||||||||||
Fund Owner(s) |
Code |
Name |
Amount |
|||||||||||||||
P41 |
Ford Motors Pvt Limited |
5,55,383.00 |
||||||||||||||||
Work Coordinator(s) |
Code |
Name |
||||||||||||||||
|
Ramkumar P |
|||||||||||||||||
|
|
Manikandan N
& Muthusamy S |
||||||||||||||||
Onsite/Student Code |
Onsite / Student Name |
Onsite / Student Address |
||||||||||||||||
OTN56 |
Govt Higher secondary School |
Velliankadu, Karamadai, Coimbatore Dt. |
||||||||||||||||
No of Beneficiary |
Onsite Contact Details |
Onsite About |
||||||||||||||||
600 |
Mr. Arulsiva -
Teacher Mob : 97904 18112 |
School has classes from
6th to 12 th st.( Tamil
and English). It has 1005 students and 31 teaching, 2 non-teaching staff
approximately. School is situated 42 km away from the district capital. Most
of the parents of the students studying in this school are daily wages -
Farming / Industry laborers. |
||||||||||||||||
Target Classes |
NA |
|||||||||||||||||
Project Start Date |
18-June-2022 |
Project
End Date |
23-Sep-2022 |
Nof Months for Staff / Nof hrs for Training |
NA |
|||||||||||||
Staff Details (Only for STAFF) |
Code |
Name |
Qualification |
Salary Per Month |
||||||||||||||
NA |
NA |
NA |
NA |
|||||||||||||||
Course Details (Only SCHOLARSHIP) |
Course Name |
Institute Address |
||||||||||||||||
NA |
NA |
|||||||||||||||||
Library Details (Only for LIBRARY) |
No. of Books/Magazines |
|||||||||||||||||
NA |
||||||||||||||||||
S.NO |
Expense Details / Purpose |
Amount Spent (INR) |
||||||||||||||||
1 |
5500 Nos. of Bricks, 6 Units M - Sand,
2 Units P - Sand, 1 _
Units _ Jelly, 98 No.s of Cement bags, Steel (373 Kgs.), Concrete Machine
and Labour, Mason and helper labour charge, 13 Nos. of Parry ware toilet
basin, 50 Nos. of Tiles, Tiles laying,
8 Nos. of Granite (3 x3 Feet), 13 Nos. of Jolly, 6 Nos. of septic
tank ring and 6 Nos. of lid, 4Ó PVC pipes, Plumbing materials and labour
charges, Electrical materials
and Labour charges, 14 lit. Asian primer, 20 lit tractor emulsion, 8 lit
Damp proof, Painting labour Charge, pavers block (1235 sq
Feet) materials, fixing, loading, unloading and transport, 3 Nos. of Steel
doors, Photographer charge, Plaque charges etc.. |
5,55,383.00 |
||||||||||||||||
Total Work Cost. INR |
5,55,383.00 |
|||||||||||||||||
Transaction from India Sudar ICICI
Bank. A/C: 000901112899 (Domestic in INR) |
||||||||||||||||||
CHQ EFT PFR |
Payee Name |
Date (DD-MON-YYYY) |
Amount (INR) |
Cheque No |
||||||||||||||
EFT |
Sri Rajalakshmi Samappa
Building Mtls |
18-06-2022 |
7800 |
NA |
||||||||||||||
EFT |
Vani Bricks |
19-06-2022 |
36000 |
NA |
||||||||||||||
EFT |
Velliangiri P |
23-06-2022 |
3000 |
NA |
||||||||||||||
EFT |
Tamilnadu
Steels Cements |
23-06-2022 |
22270 |
NA |
||||||||||||||
EFT |
Muthusamy S |
24-06-2022 (Advance
Amount) |
5000 |
NA |
||||||||||||||
EFT |
Venkateswara
Blue Matals |
28-06-2022 |
5450 |
NA |
||||||||||||||
EFT |
SureshS JCB |
28-06-2022 |
3500 |
NA |
||||||||||||||
EFT |
Rajannan |
28-06-2022 |
898 |
NA |
||||||||||||||
EFT |
ChandraMohan |
28-06-2022 |
10800 |
NA |
||||||||||||||
EFT |
Sri Rajalakshmi Samppa
Building Mtls |
01-07-2022 |
7800 |
NA |
||||||||||||||
EFT |
MUTHUSAMY S |
01-07-2022 |
900 |
NA |
||||||||||||||
EFT |
MUTHUSAMY S |
01-07-2022 |
520 |
NA |
||||||||||||||
EFT |
Kannappar
Cement Products |
02-07-2022 |
8950 |
NA |
||||||||||||||
EFT |
ChandraMohan |
02-07-2022 |
17400 |
NA |
||||||||||||||
EFT |
Kannappar
Cement Products |
04-07-2022 |
300 |
NA |
||||||||||||||
EFT |
ChandraMohan |
05-07-2022 |
14750 |
NA |
||||||||||||||
EFT |
Vani Bricks |
05-07-2022 |
13500 |
NA |
||||||||||||||
EFT |
Tamilnadu
Steels Cements |
11-07-2022 |
21820 |
NA |
||||||||||||||
EFT |
Tamilnadu
Steels Cements |
11-07-2022 |
8200 |
NA |
||||||||||||||
EFT |
Ravichandran K |
16-07-2022 |
24300 |
NA |
||||||||||||||
EFT |
ChandraMohan M |
16-07-2022 |
5700 |
NA |
||||||||||||||
EFT |
SSRTradersKovai |
03-08-2022 |
20800 |
NA |
||||||||||||||
EFT |
Sri Omm Granites And Marbles |
03-08-2022 |
8200 |
NA |
||||||||||||||
EFT |
Velliangiri P |
03-08-2022 |
1000 |
NA |
||||||||||||||
EFT |
ChandraMohan |
15-08-2022 |
8050 |
NA |
||||||||||||||
EFT |
Sri Rajalakshmi Samappa
Building Mtls |
19-08-2022 |
8600 |
NA |
||||||||||||||
EFT |
ChandraMohan |
21-08-2022 |
9550 |
NA |
||||||||||||||
EFT |
Sri Omm Granites And Marbles |
22-08-2022 |
1305 |
NA |
||||||||||||||
EFT |
Kannappar
Cement Products |
22-08-2022 |
7200 |
NA |
||||||||||||||
EFT |
ChandraMohan |
26-08-2022 |
16250 |
NA |
||||||||||||||
EFT |
Tamilnadu
Steels Cements |
30-08-2022 |
13000 |
NA |
||||||||||||||
EFT |
ChandraMohan |
30-08-2022 |
14750 |
NA |
||||||||||||||
EFT |
SSRTradersKovai |
01-09-2022 |
21180 |
NA |
||||||||||||||
EFT |
Sri Rajalakshmi Samappa
Building Mtls |
03-09-2022 |
3800 |
NA |
||||||||||||||
EFT |
ChandraMohan |
03-09-2022 |
17800 |
NA |
||||||||||||||
EFT |
Murugan P |
03-09-2022 |
5000 |
NA |
||||||||||||||
EFT |
SureshS JCB |
05-09-2022 |
2400 |
NA |
||||||||||||||
EFT |
ChandraMohan |
07-09-2022 |
18300 |
NA |
||||||||||||||
EFT |
SP Electricals Hardwares |
08-09-2022 |
20531 |
NA |
||||||||||||||
EFT |
Radhe Poddar S |
08-09-2022 |
8000 |
NA |
||||||||||||||
EFT |
MSR Engineering |
09-09-2022 |
13901 |
NA |
||||||||||||||
EFT |
Nilgiri Pavers Covai |
09-09-2022 |
20000 |
NA |
||||||||||||||
EFT |
ChandraMohan |
10-09-2022 |
15100 |
NA |
||||||||||||||
EFT |
Sasikumar R |
10-09-2022 |
5400 |
NA |
||||||||||||||
EFT |
John Maria Leonee Painter |
12-09-2022 |
5500 |
NA |
||||||||||||||
EFT |
Sasikumar R |
12-09-2022 |
8000 |
NA |
||||||||||||||
EFT |
Velliangiri P |
13-09-2022 |
1000 |
NA |
||||||||||||||
EFT |
SPElectricals Hardwares |
13-09-2022 |
10558 |
NA |
||||||||||||||
EFT |
VPT Geetha And Co |
14-09-2022 |
3600 |
NA |
||||||||||||||
EFT |
Sasikumar R |
14-09-2022 |
1800 |
NA |
||||||||||||||
EFT |
Velliangiri P |
14-09-2022 |
1400 |
NA |
||||||||||||||
EFT |
Sri Rajalakshmi Samappa
Building Mtls |
16-09-2022 |
3800 |
NA |
||||||||||||||
EFT |
Nilgiri Pavers Covai |
20-09-2022 |
41750 |
NA |
||||||||||||||
EFT |
Velliangiri P |
22-09-2022 |
3500 |
NA |
||||||||||||||
PFR |
Muthusamy S |
22-09-2022 (Advance
Amount) |
-5000 |
NA |
||||||||||||||
EFT |
Muthusamy S |
23-09-2022 |
500 |
NA |
||||||||||||||
Declaration (Not applicable for
Scholarship) |
1. India Sudar is the
owner for the movable assets provided. India Sudar
has 100% Power to take back all the movable assets provided by India Sudar at any time based on the usage and maintenance.
The beneficiary does not have any privilege to sell or move the movable
assets to anywhere. 2. The staff deployed by India Sudar should be assigned the specific purpose mentioned
in this report. They should not be overburdened by additional
responsibility. |
|||||||||||||||||
Accepted by INDIA
SUDAR, The President/Managing
Trustee/Trustee |
Accepted
by Beneficiary |
|||||||||||||||||
(BALAMANIKANDAN K) |
(Signature
and seal) |
|||||||||||||||||